• Through Bolt
  • Through Bolt
  • Through Bolt
  • Through Bolt
  • Through Bolt
  • Through Bolt
  • Through Bolt
Through Bolt
  • YD
  • China
  • 10 days
  • 100000 pcs

[product name]: Hydraulic breaker hammer through bolt; valve adjuster; side bolt; nuts
[product model]: universal accessories, we could supply all brands and models of Hydraulic breaker hammer through bolt; valve adjuster; side bolt; nuts
[customized products]: it can be customized based on the special size based on sample or detail drawing
Bolts are available in grades 10.9 and 12.9 ;Heat treatment process: tempering after quenching;Surface treatment: natural, black
Suitable Breaker Brand: SB HB GB TOKU MKB TOYO NPK OKADA DMB MSB RHB SG HM BLT MB GT
Other brand bolt specifications not listed can be produced according to customer's drawings or samples.
Bolt production process:Roughing-heat treatment-CNC precision turning-thread rolling-tapping-finished product

Hydraulic breaker hammer through bolt

Bolts are available in grades 10.9 and 12.9

Heat treatment process: tempering after quenching

Surface treatment: natural, black

Suitable Breaker Brand: SB HB GB TOKU MKB TOYO NPK OKADA DMB MSB RHB SG HM BLT MB GT

Other brand bolt specifications not listed can be produced according to customer's drawings or samples.

Bolt production process:

Roughing-heat treatment-CNC precision turning-thread rolling-tapping-finished product

hydraulic breaker through bolt

The assembly of the bolt assembly

1. Clean and dry the bolts.

2. Place the through nut on the upper end of the cylinder.

3. Pass the through bolts from top to bottom into the bolt holes. Screw in the semicircular nut. Note that the bolt should be flush with the lower end of the semicircle nut.

4. Apply glue to the hex nut of the bolt.

5. Level the breaker and tighten it with a pneumatic wrench, then use a torque wrench to detect it.

 Through bolt inspection

Note: The gas pressure in the upper body should be completely released before loosening the through bolt. Otherwise, when the through bolt is removed, the upper body will eject and cause serious consequences.

1) The nitrogen in the upper body should be completely removed (N2) before loosening the through bolts.

2) After removing all the through bolts, check them for cracks and damage.

3) When attaching the through bolts, tighten the bolts in the diagonal direction, and do not tighten a bolt in place.

4) A torque wrench of the specified range should be used.

If you have any through bolt enquiry, pls feel free to email us info@wonepart.com, we will reply to you soonest.

ISO9001 Certificate and CQC certificate
ISO9001 Certificate and CQC certificate
Delivery terms, delivery time and payment terms
Delivery terms, delivery time and payment terms
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right